Skip to main content
Cost guide · renovation & diagnostics

What the plumbing costs in a bathroom renovation

The plumbing portion of a Metro Vancouver bathroom renovation typically runs $3,500–$12,000 — usually 15–25% of the total project budget. The single biggest factor is whether fixtures stay in their existing positions or move.

These are market ranges for Metro Vancouver, not a quote. They’re here so you can plan and compare, and they’re reviewed quarterly.

Market range · Metro Vancouver⁨$3,500–$12,000
The ranges

What it costs

JobTypical installed
Like-for-like replacement, same positions
Typical installed ⁨$3,500–$6,000
Minor relocation (vanity or shower moved)
Typical installed ⁨$5,000–$8,500
Full layout change
Typical installed ⁨$8,000–$12,000
Adding a new bathroom
Typical installed ⁨$10,000–$18,000
Tub-to-shower conversion
Typical installed ⁨$3,000–$6,000
Condo bathroom
Typical installed add ⁨15–25⁩% — approvals, shut-offs, access
These are market ranges for Metro Vancouver, not a quote. They’re here so you can plan and compare, and they’re reviewed quarterly. Big jobs genuinely vary — access, materials, what’s behind the wall, what’s above the pipe. We won’t quote one without seeing it, and neither should anyone else. Where we publish a fixed price, it’s fixed.
What moves the price

What decides where in the range you land

Whether the toilet moves

The most expensive single decision. Drains need fall, and on a concrete slab or in a condo that ranges from difficult to impossible. Ask before designing the layout around it.

Whether the shower or tub moves

Drain relocation plus, potentially, venting.

Fixture type

Wall-mounted taps, wall-hung toilets, freestanding tub fillers and thermostatic valves each need specific rough-in. Choose fixtures before rough-in, not after — this is the most common sequencing mistake in bathroom renovations and it's an expensive one.

Floor construction

Joists give you room to run and re-route. A slab doesn't.

Existing pipe material

If we open the wall and find Poly-B, Kitec or galvanized, that's a decision point — and the cheapest moment you'll ever have to deal with it.

Condo factors

Strata approval, scheduled building shut-off, elevator booking, noise hours.

Adding in-floor heating

Straightforward now, a real job later.

Questions

What people ask us

What percentage of a bathroom renovation is plumbing?

Typically 15–25%.

Can I move the toilet?

Sometimes — it depends on drain fall and floor construction.

Do I need a permit?

Generally yes where fixtures move or lines change.

Do you supply the fixtures?

Either. We'll install what you've bought or supply from our suppliers.

SECOND OPINION

Got a quote you want checked?

Send it to [email protected]. We’ll tell you whether it’s fair, including when it is — and if the quote you already have is the one to take, we’ll say so.

Get a price

You’ll have the price in writing before we start.

Tell us what’s going on and we’ll come back with a number. It doesn’t move while we’re in your home.

No obligation. Emergencies answered around the clock.
  • Written quote before we start
  • $169/hr at any hour · no call-out fee
  • Permit included in the quote, not added afterward
  • Backed by our written workmanship guarantee
Call PantherBook Online