Plumber in Metrotown and Highgate
We reach Metrotown and Highgate in 90 minutes from downtown Vancouver, 24 hours a day.
Metrotown is Burnaby's densest residential tower core and — importantly — its earliest. Significant high-rise development started here well before Brentwood or Lougheed, which means a large share of the buildings date from the 1990s and early 2000s.
That timing is the whole story of plumbing in this cluster.
Why the building age matters: Kitec
Buildings constructed or plumbed between roughly 1995 and 2007 frequently contain Kitec — orange and blue pipe with brass fittings that corrode internally through dezincification.
Metrotown has one of the highest concentrations of buildings from exactly that period in Metro Vancouver.
The signal most people miss: Kitec restricts flow before it fails. Declining water pressure in a suite is often the early stage, and it's usually attributed to the building's booster system rather than to the pipe. If your building is from that era and your pressure has dropped, it's worth establishing which.
Kitec here usually surfaces through paperwork rather than a leak — an insurer asking at renewal, a depreciation report flagging it, or the strata announcing a repipe programme.
The rest of the tower picture
Suite-to-suite leaks, the most common call in any tower. Water almost never originates directly above the wet patch — it tracks along joists and emerges metres from the failure. We trace and document, because in a strata the documentation is what settles who pays.
In-suite hot water tanks. Buildings of this age are on their second round of tanks. The plumbing is an hour; getting the old one out through a finished suite and into a booked service elevator is the job.
High-floor pressure complaints, which are frequently the building's booster or pressure zone system rather than anything in your suite — and knowing that saves you paying for the wrong repair.
Highgate and the lower-rise stock
Highgate and the streets south of Kingsway are a mix of newer mid-rise, older low-rise walk-ups, and detached housing. The older low-rise stock behaves differently again — cast iron waste stacks and galvanized supply rather than Kitec — and it's easy to assume the tower answer applies when it doesn't.

