رفتن به محتوای اصلی
Cost guide · renovation & diagnostics

What the plumbing costs in a bathroom renovation

The plumbing portion of a Metro Vancouver bathroom renovation typically runs $3,500–$12,000 — usually 15–25% of the total project budget. The single biggest factor is whether fixtures stay in their existing positions or move.

These are market ranges for Metro Vancouver, not a quote. They’re here so you can plan and compare, and they’re reviewed quarterly.

Market range · Metro Vancouver⁨$3,500–$12,000
The ranges

What it costs

JobTypical installed
Like-for-like replacement, same positions
Typical installed ⁨$3,500–$6,000
Minor relocation (vanity or shower moved)
Typical installed ⁨$5,000–$8,500
Full layout change
Typical installed ⁨$8,000–$12,000
Adding a new bathroom
Typical installed ⁨$10,000–$18,000
Tub-to-shower conversion
Typical installed ⁨$3,000–$6,000
Condo bathroom
Typical installed add ⁨15–25⁩% — approvals, shut-offs, access
These are market ranges for Metro Vancouver, not a quote. They’re here so you can plan and compare, and they’re reviewed quarterly. Big jobs genuinely vary — access, materials, what’s behind the wall, what’s above the pipe. We won’t quote one without seeing it, and neither should anyone else. Where we publish a fixed price, it’s fixed.
What moves the price

What decides where in the range you land

Whether the toilet moves

The most expensive single decision. Drains need fall, and on a concrete slab or in a condo that ranges from difficult to impossible. Ask before designing the layout around it.

Whether the shower or tub moves

Drain relocation plus, potentially, venting.

Fixture type

Wall-mounted taps, wall-hung toilets, freestanding tub fillers and thermostatic valves each need specific rough-in. Choose fixtures before rough-in, not after — this is the most common sequencing mistake in bathroom renovations and it's an expensive one.

Floor construction

Joists give you room to run and re-route. A slab doesn't.

Existing pipe material

If we open the wall and find Poly-B, Kitec or galvanized, that's a decision point — and the cheapest moment you'll ever have to deal with it.

Condo factors

Strata approval, scheduled building shut-off, elevator booking, noise hours.

Adding in-floor heating

Straightforward now, a real job later.

Questions

What people ask us

What percentage of a bathroom renovation is plumbing?

Typically 15–25%.

Can I move the toilet?

Sometimes — it depends on drain fall and floor construction.

Do I need a permit?

Generally yes where fixtures move or lines change.

Do you supply the fixtures?

Either. We'll install what you've bought or supply from our suppliers.

SECOND OPINION

Got a quote you want checked?

Send it to [email protected]. We’ll tell you whether it’s fair, including when it is — and if the quote you already have is the one to take, we’ll say so.

قیمت بگیرید

قیمت را پیش از شروع کار، کتبی دریافت می‌کنید.

بگویید چه اتفاقی افتاده تا عددش را به شما بدهیم. تا وقتی در خانهٔ شما هستیم، آن عدد تغییر نمی‌کند.

بدون هیچ تعهدی. موارد اضطراری در تمام شبانه‌روز پاسخ داده می‌شود.
  • برآورد کتبی، پیش از شروع کار
  • ساعتی ۱۶۹ دلار در هر ساعت از شبانه‌روز — بدون هزینهٔ اعزام
  • هزینهٔ مجوز داخل برآورد است، نه اضافه‌شده پس از کار
  • با ضمانت‌نامهٔ کتبی کیفیت کار ما پشتیبانی می‌شود
تماس با پنتررزرو آنلاین